Two stiles needed fixing on the short path from Smithy Green Farm to the lane above Penny Bridge Church. PathFix volunteers TL & GC rebuilt both steps on one and repaired the step on another.
Stile 1 BEFORE:
The rails and uprights were secure on this stile, but both steps were rotted and at least one step support post was in danger of collapsing.

Stile 1 AFTER:
It is now secure and fully usable, after PathFix volunteers TL & GC replaced both steps and all their support posts.

Stile 2 BEFORE:
The old steps were rotting on the stile at the other end of that path, where it leaves the wood onto the lane above Penny Bridge Church.

Stile 2 AFTER:
So they replaced both steps on that stile.
